SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR
GoodTarrant County, Texas · 0.3 Mi. E. of University · Structure no. 022200106801495
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,328 ft
- 4 main spans
- Daily traffic
- 15,227
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR is a steel continuous stringer/multi-beam or girder carrying SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,227 vehicles a day, roughly 1% of them trucks, projected to reach 21,318 by 2042. The structure is 2,328 ft (709.6 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR built?
It was built in 2016, making it 9 years old in 2025.
What condition is SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR carry?
About 15,227 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR?
The structure is 2,328 ft (709.6 m) long with a longest span of 238 ft (72.5 m) and a deck 51 ft wide.
Who owns SH121 NB to IH30EB over FORESTPK/VICK/30EBOFF/RR?
It is owned by the State Highway Agency and maintained by the State Toll Authority.