US Bridges

IH 30 Ramp Wh over Hemphill Lamar Taylor

Good

Tarrant County, Texas · 0.6 MI W of IH 35 W · Structure no. 022200106801297

Built
2000
25 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
120 ft
1 main span
Daily traffic
13,120
2013 count
Owner
State
State Highway Agency

About this bridge

IH 30 Ramp Wh over Hemphill Lamar Taylor is a prestressed concrete stringer/multi-beam or girder carrying IH 30 Ramp Wh over Hemphill Lamar Taylor in Tarrant County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,120 vehicles a day, roughly 14% of them trucks, projected to reach 18,370 by 2033. The structure is 120 ft (36.6 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 30 Ramp Wh
CrossesHemphill Lamar Taylor
Location0.6 MI W of IH 35 W
RouteState Highway 30
StateTexas
Coordinates32.74514, -97.33235
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span120 ft (36.6 m)
Deck width36 ft (11 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,120 (2013)
Projected traffic18,370 by 2033
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30 Ramp Wh over Hemphill Lamar Taylor built?

It was built in 2000, making it 25 years old in 2025.

What condition is IH 30 Ramp Wh over Hemphill Lamar Taylor in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does IH 30 Ramp Wh over Hemphill Lamar Taylor carry?

About 13,120 vehicles per day (2013 count), of which roughly 14% are trucks.

How long is IH 30 Ramp Wh over Hemphill Lamar Taylor?

The structure is 120 ft (36.6 m) long with a longest span of 120 ft (36.6 m) and a deck 36 ft wide.

Who owns IH 30 Ramp Wh over Hemphill Lamar Taylor?

It is owned by the State Highway Agency.