US Bridges

Arbor Lawn Dr. EB over Chisholm (ntta)

Good

Tarrant County, Texas · Arbor Lawn EB @ Chisholm · Structure no. 022200050402485

Built
2013
12 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
2 main spans
Daily traffic
6,780
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

Arbor Lawn Dr. EB over Chisholm (ntta) is a prestressed concrete stringer/multi-beam or girder carrying Arbor Lawn Dr. EB over Chisholm (ntta) in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,780 vehicles a day, projected to reach 6,880 by 2033. The structure is 150 ft (45.7 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesArbor Lawn Dr. EB
CrossesChisholm (ntta)
LocationArbor Lawn EB @ Chisholm
RouteCity Street 0
StateTexas
Coordinates32.69848, -97.40592
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length150 ft (45.7 m)
Longest span75 ft (22.9 m)
Deck width59 ft (18.1 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,780 (2013)
Projected traffic6,880 by 2033
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Arbor Lawn Dr. EB over Chisholm (ntta) built?

It was built in 2013, making it 12 years old in 2025.

What condition is Arbor Lawn Dr. EB over Chisholm (ntta) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Arbor Lawn Dr. EB over Chisholm (ntta) carry?

About 6,780 vehicles per day (2013 count).

How long is Arbor Lawn Dr. EB over Chisholm (ntta)?

The structure is 150 ft (45.7 m) long with a longest span of 75 ft (22.9 m) and a deck 59 ft wide.

Who owns Arbor Lawn Dr. EB over Chisholm (ntta)?

It is owned by the City or Municipal Highway Agency.