US Bridges

SH114WB/INT Pky SB over SH 114 & Intl Pkwy

Good

Tarrant County, Texas · SH114-121 Split @ Dfw · Structure no. 022200035303459

Built
2012
13 years old
Condition
Good
inspected May 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
2,427 ft
19 main spans
Daily traffic
16,000
2010 count
Owner
State
State Highway Agency

About this bridge

SH114WB/INT Pky SB over SH 114 & Intl Pkwy is a prestressed concrete stringer/multi-beam or girder carrying SH114WB/INT Pky SB over SH 114 & Intl Pkwy in Tarrant County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,000 vehicles a day, roughly 1% of them trucks, projected to reach 24,600 by 2030. The structure is 2,427 ft (739.8 m) long and 45 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesSH114WB/INT Pky SB
CrossesSH 114 & Intl Pkwy
LocationSH114-121 Split @ Dfw
RouteState Highway 114
StateTexas
Coordinates32.93424, -97.03725
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans19 (+3 approach)
Design loadHL 93
Structure length2,427 ft (739.8 m)
Longest span125 ft (38.1 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,000 (2010)
Projected traffic24,600 by 2030
Trucks1%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH114WB/INT Pky SB over SH 114 & Intl Pkwy built?

It was built in 2012, making it 13 years old in 2025.

What condition is SH114WB/INT Pky SB over SH 114 & Intl Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does SH114WB/INT Pky SB over SH 114 & Intl Pkwy carry?

About 16,000 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is SH114WB/INT Pky SB over SH 114 & Intl Pkwy?

The structure is 2,427 ft (739.8 m) long with a longest span of 125 ft (38.1 m) and a deck 45 ft wide.

Who owns SH114WB/INT Pky SB over SH 114 & Intl Pkwy?

It is owned by the State Highway Agency.