US Bridges

Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB

Good

Tarrant County, Texas · Intl SB @ SH 114 EB · Structure no. 022200035303457

Built
2013
12 years old
Condition
Good
inspected May 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,145 ft
7 main spans
Daily traffic
8,089
2019 count
Owner
State
State Highway Agency

About this bridge

Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB is a prestressed concrete stringer/multi-beam or girder carrying Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB in Tarrant County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,089 vehicles a day, roughly 5% of them trucks, projected to reach 3,900 by 2032. The structure is 1,145 ft (349 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesIntl SB to SH114EB
CrossesSH 114 Ml & Intl Pkwy NB
LocationIntl SB @ SH 114 EB
RouteState Highway 114
StateTexas
Coordinates32.93272, -97.04011
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans7 (+2 approach)
Design loadHL 93
Structure length1,145 ft (349 m)
Longest span160 ft (48.8 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,089 (2019)
Projected traffic3,900 by 2032
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB built?

It was built in 2013, making it 12 years old in 2025.

What condition is Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB carry?

About 8,089 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB?

The structure is 1,145 ft (349 m) long with a longest span of 160 ft (48.8 m) and a deck 28 ft wide.

Who owns Intl SB to SH114EB over SH 114 Ml & Intl Pkwy NB?

It is owned by the State Highway Agency.