SP280EB to IH35 NB over SP 280
GoodTarrant County, Texas · 0.1 MI E of IH 35W · Structure no. 022200017206267
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 200 ft
- 2 main spans
- Daily traffic
- 31,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SP280EB to IH35 NB over SP 280 is a steel continuous stringer/multi-beam or girder carrying SP280EB to IH35 NB over SP 280 in Tarrant County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 31,000 vehicles a day, roughly 3% of them trucks, projected to reach 44,860 by 2033. The structure is 200 ft (61 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SP280EB to IH35 NB over SP 280 built?
It was built in 2002, making it 23 years old in 2025.
What condition is SP280EB to IH35 NB over SP 280 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does SP280EB to IH35 NB over SP 280 carry?
About 31,000 vehicles per day (2013 count), of which roughly 3% are trucks.
How long is SP280EB to IH35 NB over SP 280?
The structure is 200 ft (61 m) long with a longest span of 100 ft (30.5 m) and a deck 40 ft wide.
Who owns SP280EB to IH35 NB over SP 280?
It is owned by the State Highway Agency.