US Bridges

SP280EB to IH35 SB over IH 35 SB Ramp to IH 30

Fair

Tarrant County, Texas · 0.5 MI N of IH 30 · Structure no. 022200001416419

Built
1988
37 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
440 ft
5 main spans
Daily traffic
19,500
2013 count
Owner
State
State Highway Agency

About this bridge

SP280EB to IH35 SB over IH 35 SB Ramp to IH 30 is a prestressed concrete stringer/multi-beam or girder carrying SP280EB to IH35 SB over IH 35 SB Ramp to IH 30 in Tarrant County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 19,500 vehicles a day, roughly 3% of them trucks, projected to reach 27,630 by 2033. The structure is 440 ft (134.1 m) long and 28 ft wide.

CarriesSP280EB to IH35 SB
CrossesIH 35 SB Ramp to IH 30
Location0.5 MI N of IH 30
RouteState Highway 280
StateTexas
Coordinates32.75397, -97.32023
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length440 ft (134.1 m)
Longest span109 ft (33.2 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,500 (2013)
Projected traffic27,630 by 2033
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SP280EB to IH35 SB over IH 35 SB Ramp to IH 30 built?

It was built in 1988, making it 37 years old in 2025.

What condition is SP280EB to IH35 SB over IH 35 SB Ramp to IH 30 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does SP280EB to IH35 SB over IH 35 SB Ramp to IH 30 carry?

About 19,500 vehicles per day (2013 count), of which roughly 3% are trucks.

How long is SP280EB to IH35 SB over IH 35 SB Ramp to IH 30?

The structure is 440 ft (134.1 m) long with a longest span of 109 ft (33.2 m) and a deck 28 ft wide.

Who owns SP280EB to IH35 SB over IH 35 SB Ramp to IH 30?

It is owned by the State Highway Agency.