US Bridges

IH35W SB Gp Lanes over Keller Hicks RD

Good

Tarrant County, Texas · 3.8 MI S of Alliance Blvd · Structure no. 022200008112343

Built
2020
5 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
173 ft
2 main spans
Daily traffic
34,000
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

IH35W SB Gp Lanes over Keller Hicks RD is a prestressed concrete stringer/multi-beam or girder carrying IH35W SB Gp Lanes over Keller Hicks RD in Tarrant County, Texas. It was built in 2020, so it is 5 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,000 vehicles a day, roughly 14% of them trucks, projected to reach 67,000 by 2039. The structure is 173 ft (52.7 m) long and 40 ft wide.

CarriesIH35W SB Gp Lanes
CrossesKeller Hicks RD
Location3.8 MI S of Alliance Blvd
RouteInterstate 35
StateTexas
Coordinates32.9423, -97.31286
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length173 ft (52.7 m)
Longest span90 ft (27.4 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,000 (2019)
Projected traffic67,000 by 2039
Trucks14%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH35W SB Gp Lanes over Keller Hicks RD built?

It was built in 2020, making it 5 years old in 2025.

What condition is IH35W SB Gp Lanes over Keller Hicks RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does IH35W SB Gp Lanes over Keller Hicks RD carry?

About 34,000 vehicles per day (2019 count), of which roughly 14% are trucks.

How long is IH35W SB Gp Lanes over Keller Hicks RD?

The structure is 173 ft (52.7 m) long with a longest span of 90 ft (27.4 m) and a deck 40 ft wide.

Who owns IH35W SB Gp Lanes over Keller Hicks RD?

It is owned by the Local Toll Authority.