US Bridges

IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes

Good

Tarrant County, Texas · 0.5 Mi. N. of SH 183 · Structure no. 022200001416598

Built
2016
9 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
985 ft
8 main spans
Daily traffic
4,600
2015 count
Owner
Toll Authority
Local Toll Authority

About this bridge

IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes is a prestressed concrete stringer/multi-beam or girder carrying IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,600 vehicles a day, roughly 11% of them trucks, projected to reach 7,800 by 2035. The structure is 985 ft (300.2 m) long and 28 ft wide.

CarriesIH-35 NB On-Rmp Ml
CrossesIH-35W NB Gp Lanes
Location0.5 Mi. N. of SH 183
StateTexas
Coordinates32.79996, -97.32024
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans8
Design loadHL 93
Structure length985 ft (300.2 m)
Longest span136 ft (41.5 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,600 (2015)
Projected traffic7,800 by 2035
Trucks11%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes carry?

About 4,600 vehicles per day (2015 count), of which roughly 11% are trucks.

How long is IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes?

The structure is 985 ft (300.2 m) long with a longest span of 136 ft (41.5 m) and a deck 28 ft wide.

Who owns IH-35 NB On-Rmp Ml over IH-35W NB Gp Lanes?

It is owned by the Local Toll Authority.