US Bridges

IH35W Ml over UP R/R Long NE 36th ST

Good

Tarrant County, Texas · 1.1 Mi. N. of SH 183 · Structure no. 022200001416593

Built
2016
9 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
918 ft
1 main span
Daily traffic
143,855
2022 count
Owner
Toll Authority
Local Toll Authority

About this bridge

IH35W Ml over UP R/R Long NE 36th ST is a steel stringer/multi-beam or girder carrying IH35W Ml over UP R/R Long NE 36th ST in Tarrant County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 143,855 vehicles a day, roughly 13% of them trucks, projected to reach 201,397 by 2042. The structure is 918 ft (279.8 m) long and 92 ft wide.

CarriesIH35W Ml
CrossesUP R/R Long NE 36th ST
Location1.1 Mi. N. of SH 183
StateTexas
Coordinates32.80875, -97.31525
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+6 approach)
Design loadUnknown
Structure length918 ft (279.8 m)
Longest span232 ft (70.7 m)
Deck width92 ft (28 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic143,855 (2022)
Projected traffic201,397 by 2042
Trucks13%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH35W Ml over UP R/R Long NE 36th ST built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH35W Ml over UP R/R Long NE 36th ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does IH35W Ml over UP R/R Long NE 36th ST carry?

About 143,855 vehicles per day (2022 count), of which roughly 13% are trucks.

How long is IH35W Ml over UP R/R Long NE 36th ST?

The structure is 918 ft (279.8 m) long with a longest span of 232 ft (70.7 m) and a deck 92 ft wide.

Who owns IH35W Ml over UP R/R Long NE 36th ST?

It is owned by the Local Toll Authority.