US Bridges

Mcallister RD over IH 35W

Good

Tarrant County, Texas · 1.331 MI S of FM1187 · Structure no. 022200001402354

Built
1976
49 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
262 ft
3 main spans
Daily traffic
7,982
2024 count
Owner
State
State Highway Agency

About this bridge

Mcallister RD over IH 35W is a prestressed concrete stringer/multi-beam or girder carrying Mcallister RD over IH 35W in Tarrant County, Texas. It was built in 1976, so it is 49 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,982 vehicles a day, projected to reach 3,520 by 2029. The structure is 262 ft (79.9 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMcallister RD
CrossesIH 35W
Location1.331 MI S of FM1187
RouteCity Street 0
StateTexas
Coordinates32.57185, -97.31902
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3 (+1 approach)
Design loadHS 20
Structure length262 ft (79.9 m)
Longest span78 ft (23.8 m)
Deck width46 ft (14.1 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,982 (2024)
Projected traffic3,520 by 2029
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mcallister RD over IH 35W built?

It was built in 1976, making it 49 years old in 2025.

What condition is Mcallister RD over IH 35W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Mcallister RD over IH 35W carry?

About 7,982 vehicles per day (2024 count).

How long is Mcallister RD over IH 35W?

The structure is 262 ft (79.9 m) long with a longest span of 78 ft (23.8 m) and a deck 46 ft wide.

Who owns Mcallister RD over IH 35W?

It is owned by the State Highway Agency.