US Bridges

IH-35W Nbta over IH-35W

Good

Tarrant County, Texas · 6.2 MI S of IH-20 · Structure no. 022200001402496

Built
2009
16 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
361 ft
4 main spans
Daily traffic
800
2007 count
Owner
State
State Highway Agency

About this bridge

IH-35W Nbta over IH-35W is a prestressed concrete stringer/multi-beam or girder carrying IH-35W Nbta over IH-35W in Tarrant County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 800 vehicles a day, projected to reach 1,200 by 2027. The structure is 361 ft (110 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH-35W Nbta
CrossesIH-35W
Location6.2 MI S of IH-20
RouteInterstate 35
StateTexas
Coordinates32.57857, -97.31993
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length361 ft (110 m)
Longest span98 ft (29.9 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic800 (2007)
Projected traffic1,200 by 2027
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH-35W Nbta over IH-35W built?

It was built in 2009, making it 16 years old in 2025.

What condition is IH-35W Nbta over IH-35W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does IH-35W Nbta over IH-35W carry?

About 800 vehicles per day (2007 count).

How long is IH-35W Nbta over IH-35W?

The structure is 361 ft (110 m) long with a longest span of 98 ft (29.9 m) and a deck 28 ft wide.

Who owns IH-35W Nbta over IH-35W?

It is owned by the State Highway Agency.