US Bridges

Bb Fielder DR over Drainage Ditch

Good

Parker County, Texas · 0.6 MI W of FM 1884 · Structure no. 021840B00034002

Built
2015
10 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
58 ft
5 main spans
Daily traffic
1,000
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bb Fielder DR over Drainage Ditch is a concrete culvert carrying Bb Fielder DR over Drainage Ditch in Parker County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, projected to reach 1,500 by 2041. The structure is 58 ft (17.7 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBb Fielder DR
CrossesDrainage Ditch
Location0.6 MI W of FM 1884
RouteCity Street 0
StateTexas
Coordinates32.72356, -97.8201
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans5
Design loadHL 93
Structure length58 ft (17.7 m)
Longest span10 ft (3 m)
Deck width82 ft (25 m)
Roadway width48 ft (14.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2021)
Projected traffic1,500 by 2041
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bb Fielder DR over Drainage Ditch built?

It was built in 2015, making it 10 years old in 2025.

What condition is Bb Fielder DR over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Bb Fielder DR over Drainage Ditch carry?

About 1,000 vehicles per day (2021 count).

How long is Bb Fielder DR over Drainage Ditch?

The structure is 58 ft (17.7 m) long with a longest span of 10 ft (3 m) and a deck 82 ft wide.

Who owns Bb Fielder DR over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.