US Bridges

Bb Fielder &summer over East Sanchez Creek

Fair

Parker County, Texas · 0.06 MI W of FM 1884 · Structure no. 021840B00034001

Built
2007
18 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
54 ft
4 main spans
Daily traffic
2,500
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bb Fielder &summer over East Sanchez Creek is a concrete culvert carrying Bb Fielder &summer over East Sanchez Creek in Parker County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,500 vehicles a day, roughly 13% of them trucks, projected to reach 3,800 by 2039. The structure is 54 ft (16.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBb Fielder &summer
CrossesEast Sanchez Creek
Location0.06 MI W of FM 1884
RouteCity Street 0
StateTexas
Coordinates32.72226, -97.81185
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length54 ft (16.5 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2019)
Projected traffic3,800 by 2039
Trucks13%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bb Fielder &summer over East Sanchez Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is Bb Fielder &summer over East Sanchez Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Bb Fielder &summer over East Sanchez Creek carry?

About 2,500 vehicles per day (2019 count), of which roughly 13% are trucks.

How long is Bb Fielder &summer over East Sanchez Creek?

The structure is 54 ft (16.5 m) long with a longest span of 10 ft (3 m).

Who owns Bb Fielder &summer over East Sanchez Creek?

It is owned by the City or Municipal Highway Agency.