US Bridges

Stgecoch Rch Pct 2 over Trib Willow Creek

Good

Parker County, Texas · 0.1 MI E of FM 51 · Structure no. 021840AA0677003

Built
2021
4 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
38 ft
5 main spans
Daily traffic
100
2021 count
Owner
County
County Highway Agency

About this bridge

Stgecoch Rch Pct 2 over Trib Willow Creek is a concrete culvert carrying Stgecoch Rch Pct 2 over Trib Willow Creek in Parker County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 250 by 2041. The structure is 38 ft (11.6 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesStgecoch Rch Pct 2
CrossesTrib Willow Creek
Location0.1 MI E of FM 51
RouteCounty Highway 0
StateTexas
Coordinates32.81103, -97.7773
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHL 93
Structure length38 ft (11.6 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic250 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stgecoch Rch Pct 2 over Trib Willow Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Stgecoch Rch Pct 2 over Trib Willow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Stgecoch Rch Pct 2 over Trib Willow Creek carry?

About 100 vehicles per day (2021 count).

How long is Stgecoch Rch Pct 2 over Trib Willow Creek?

The structure is 38 ft (11.6 m) long with a longest span of 6 ft (1.8 m).

Who owns Stgecoch Rch Pct 2 over Trib Willow Creek?

It is owned by the County Highway Agency.