US Bridges

Stgecach Rch Pct 2 over Trib Willow Creek

Fair

Parker County, Texas · 0.65 MI E of FM 51 · Structure no. 021840AA0677001

Built
2021
4 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
50 ft
4 main spans
Daily traffic
100
2021 count
Owner
County
County Highway Agency

About this bridge

Stgecach Rch Pct 2 over Trib Willow Creek is a concrete culvert carrying Stgecach Rch Pct 2 over Trib Willow Creek in Parker County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, projected to reach 250 by 2041. The structure is 50 ft (15.2 m) long. If it were closed, the detour would be 98.8 mi (159 km).

CarriesStgecach Rch Pct 2
CrossesTrib Willow Creek
Location0.65 MI E of FM 51
RouteCounty Highway 0
StateTexas
Coordinates32.80813, -97.76929
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2021)
Projected traffic250 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Stgecach Rch Pct 2 over Trib Willow Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Stgecach Rch Pct 2 over Trib Willow Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Stgecach Rch Pct 2 over Trib Willow Creek carry?

About 100 vehicles per day (2021 count).

How long is Stgecach Rch Pct 2 over Trib Willow Creek?

The structure is 50 ft (15.2 m) long with a longest span of 9 ft (2.7 m).

Who owns Stgecach Rch Pct 2 over Trib Willow Creek?

It is owned by the County Highway Agency.