Fairview DR Pct 3 over Big Grindstone CR
GoodParker County, Texas · 2.0 MI SE of FM 113 · Structure no. 021840AA0495001
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 75 ft
- 1 main span
- Daily traffic
- 886
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Fairview DR Pct 3 over Big Grindstone CR is a prestressed concrete stringer/multi-beam or girder carrying Fairview DR Pct 3 over Big Grindstone CR in Parker County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 886 vehicles a day, projected to reach 700 by 2029. The structure is 75 ft (22.9 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview DR Pct 3 over Big Grindstone CR built?
It was built in 2005, making it 20 years old in 2025.
What condition is Fairview DR Pct 3 over Big Grindstone CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Fairview DR Pct 3 over Big Grindstone CR carry?
About 886 vehicles per day (2024 count).
How long is Fairview DR Pct 3 over Big Grindstone CR?
The structure is 75 ft (22.9 m) long with a longest span of 75 ft (22.9 m) and a deck 30 ft wide.
Who owns Fairview DR Pct 3 over Big Grindstone CR?
It is owned by the County Highway Agency.