Clary RD - Pct 3 over Trib Big Grindstone Crk
GoodParker County, Texas · 0.25 MI N of Cox RD · Structure no. 021840AA0491001
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Clary RD - Pct 3 over Trib Big Grindstone Crk is a steel stringer/multi-beam or girder carrying Clary RD - Pct 3 over Trib Big Grindstone Crk in Parker County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, projected to reach 310 by 2029. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clary RD - Pct 3 over Trib Big Grindstone Crk built?
It was built in 2003, making it 22 years old in 2025.
What condition is Clary RD - Pct 3 over Trib Big Grindstone Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Clary RD - Pct 3 over Trib Big Grindstone Crk carry?
About 100 vehicles per day (2019 count).
How long is Clary RD - Pct 3 over Trib Big Grindstone Crk?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 24 ft wide.
Who owns Clary RD - Pct 3 over Trib Big Grindstone Crk?
It is owned by the County Highway Agency.