Mikus RD Pct 4 over Trib to Clr Frk Trin Riv
FairParker County, Texas · 0.6 MI N of IH 20 · Structure no. 021840AA0339001
- Built
- 1998
- 27 years old, rebuilt 2008
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 74 ft
- 2 main spans
- Daily traffic
- 1,654
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Mikus RD Pct 4 over Trib to Clr Frk Trin Riv is a steel continuous stringer/multi-beam or girder carrying Mikus RD Pct 4 over Trib to Clr Frk Trin Riv in Parker County, Texas. It was built in 1998 and reconstructed in 2008, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,654 vehicles a day, projected to reach 1,310 by 2030. The structure is 74 ft (22.6 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mikus RD Pct 4 over Trib to Clr Frk Trin Riv built?
It was built in 1998, making it 27 years old in 2025. It was reconstructed in 2008.
What condition is Mikus RD Pct 4 over Trib to Clr Frk Trin Riv in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Mikus RD Pct 4 over Trib to Clr Frk Trin Riv carry?
About 1,654 vehicles per day (2019 count).
How long is Mikus RD Pct 4 over Trib to Clr Frk Trin Riv?
The structure is 74 ft (22.6 m) long with a longest span of 44 ft (13.4 m) and a deck 31 ft wide.
Who owns Mikus RD Pct 4 over Trib to Clr Frk Trin Riv?
It is owned by the County Highway Agency.