US Bridges

Crown Road - Pct 4 over Clear Fk Trinity Ri

Fair

Parker County, Texas · 0.9 Mi. N. IH 20 · Structure no. 021840AA0337001

Built
1981
44 years old, rebuilt 2013
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
75 ft
3 main spans
Daily traffic
3,188
2024 count
Owner
County
County Highway Agency

About this bridge

Crown Road - Pct 4 over Clear Fk Trinity Ri is a steel continuous stringer/multi-beam or girder carrying Crown Road - Pct 4 over Clear Fk Trinity Ri in Parker County, Texas. It was built in 1981 and reconstructed in 2013, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,188 vehicles a day, projected to reach 1,060 by 2030. The structure is 75 ft (22.9 m) long and 26 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesCrown Road - Pct 4
CrossesClear Fk Trinity Ri
Location0.9 Mi. N. IH 20
RouteCounty Highway 0
StateTexas
Coordinates32.75247, -97.6643
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating57 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length75 ft (22.9 m)
Longest span34 ft (10.4 m)
Deck width26 ft (8 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,188 (2024)
Projected traffic1,060 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$4,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Crown Road - Pct 4 over Clear Fk Trinity Ri built?

It was built in 1981, making it 44 years old in 2025. It was reconstructed in 2013.

What condition is Crown Road - Pct 4 over Clear Fk Trinity Ri in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Crown Road - Pct 4 over Clear Fk Trinity Ri carry?

About 3,188 vehicles per day (2024 count).

How long is Crown Road - Pct 4 over Clear Fk Trinity Ri?

The structure is 75 ft (22.9 m) long with a longest span of 34 ft (10.4 m) and a deck 26 ft wide.

Who owns Crown Road - Pct 4 over Clear Fk Trinity Ri?

It is owned by the County Highway Agency.