Advance RD Pct 2 over Dry Creek
GoodParker County, Texas · 0.3 Mi. North of FM 1885 · Structure no. 021840AA0171001
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 1 main span
- Daily traffic
- 788
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Advance RD Pct 2 over Dry Creek is a steel stringer/multi-beam or girder carrying Advance RD Pct 2 over Dry Creek in Parker County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 788 vehicles a day, projected to reach 600 by 2030. The structure is 54 ft (16.5 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Advance RD Pct 2 over Dry Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Advance RD Pct 2 over Dry Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Advance RD Pct 2 over Dry Creek carry?
About 788 vehicles per day (2024 count).
How long is Advance RD Pct 2 over Dry Creek?
The structure is 54 ft (16.5 m) long with a longest span of 53 ft (16.2 m) and a deck 25 ft wide.
Who owns Advance RD Pct 2 over Dry Creek?
It is owned by the County Highway Agency.