Advance RD - Pct 2 over Trib to Dry Creek
FairPosted for loadParker County, Texas · 1.4 Mi. West of FM 1885 · Structure no. 021840AA0154001
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 37 ft
- 1 main span
- Daily traffic
- 654
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Advance RD - Pct 2 over Trib to Dry Creek is a steel stringer/multi-beam or girder carrying Advance RD - Pct 2 over Trib to Dry Creek in Parker County, Texas. It was built in 1991, so it is 34 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 654 vehicles a day, projected to reach 470 by 2030. The structure is 37 ft (11.3 m) long and 25 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Advance RD - Pct 2 over Trib to Dry Creek built?
It was built in 1991, making it 34 years old in 2025.
What condition is Advance RD - Pct 2 over Trib to Dry Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Advance RD - Pct 2 over Trib to Dry Creek carry?
About 654 vehicles per day (2024 count).
How long is Advance RD - Pct 2 over Trib to Dry Creek?
The structure is 37 ft (11.3 m) long with a longest span of 36 ft (11 m) and a deck 25 ft wide.
Who owns Advance RD - Pct 2 over Trib to Dry Creek?
It is owned by the County Highway Agency.