Oran Rd. - Pct 2 over Trib E Fork Keechi Creek
GoodPalo Pinto County, Texas · 1.2 MI N of FM-52 · Structure no. 021820AA0150001
- Built
- 1920
- 105 years old
- Condition
- Good
- inspected February 2023
- Type
- Slab
- Concrete Continuous
- Length
- 41 ft
- 3 main spans
- Daily traffic
- 207
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Oran Rd. - Pct 2 over Trib E Fork Keechi Creek is a concrete continuous slab carrying Oran Rd. - Pct 2 over Trib E Fork Keechi Creek in Palo Pinto County, Texas. It was built in 1920, so it is 105 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 207 vehicles a day, projected to reach 450 by 2030. The structure is 41 ft (12.5 m) long and 26 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Oran Rd. - Pct 2 over Trib E Fork Keechi Creek built?
It was built in 1920, making it 105 years old in 2025.
What condition is Oran Rd. - Pct 2 over Trib E Fork Keechi Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Oran Rd. - Pct 2 over Trib E Fork Keechi Creek carry?
About 207 vehicles per day (2024 count).
How long is Oran Rd. - Pct 2 over Trib E Fork Keechi Creek?
The structure is 41 ft (12.5 m) long with a longest span of 13 ft (4 m) and a deck 26 ft wide.
Who owns Oran Rd. - Pct 2 over Trib E Fork Keechi Creek?
It is owned by the County Highway Agency.