US Bridges

Ol Christian Pct 2 over Keechi Creek

Good

Palo Pinto County, Texas · 3.0 MI N of FM 52 · Structure no. 021820AA0148001

Built
2011
14 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
125 ft
1 main span
Daily traffic
12
2022 count
Owner
County
County Highway Agency

About this bridge

Ol Christian Pct 2 over Keechi Creek is a prestressed concrete stringer/multi-beam or girder carrying Ol Christian Pct 2 over Keechi Creek in Palo Pinto County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12 vehicles a day, projected to reach 100 by 2030. The structure is 125 ft (38.1 m) long and 26 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesOl Christian Pct 2
CrossesKeechi Creek
Location3.0 MI N of FM 52
RouteCounty Highway 0
StateTexas
Coordinates32.98163, -98.18529
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+1 approach)
Design loadHL 93
Structure length125 ft (38.1 m)
Longest span85 ft (25.9 m)
Deck width26 ft (8 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12 (2022)
Projected traffic100 by 2030
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ol Christian Pct 2 over Keechi Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Ol Christian Pct 2 over Keechi Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Ol Christian Pct 2 over Keechi Creek carry?

About 12 vehicles per day (2022 count).

How long is Ol Christian Pct 2 over Keechi Creek?

The structure is 125 ft (38.1 m) long with a longest span of 85 ft (25.9 m) and a deck 26 ft wide.

Who owns Ol Christian Pct 2 over Keechi Creek?

It is owned by the County Highway Agency.