US Bridges

Nbfr US 77 over Drainage Ditch

Good

Nueces County, Texas · 3.0 MI NE of FM 665 · Structure no. 161780010202199

Built
2021
4 years old
Condition
Good
inspected January 2024
Type
Other
Prestressed Concrete
Length
165 ft
3 main spans
Daily traffic
2,150
2017 count
Owner
State
State Highway Agency

About this bridge

Nbfr US 77 over Drainage Ditch is a prestressed concrete other carrying Nbfr US 77 over Drainage Ditch in Nueces County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,150 vehicles a day, projected to reach 15,550 by 2042. The structure is 165 ft (50.3 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNbfr US 77
CrossesDrainage Ditch
Location3.0 MI NE of FM 665
RouteU.S. Route 77
StateTexas
Coordinates27.71163, -97.72214
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length165 ft (50.3 m)
Longest span55 ft (16.8 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,150 (2017)
Projected traffic15,550 by 2042
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Nbfr US 77 over Drainage Ditch built?

It was built in 2021, making it 4 years old in 2025.

What condition is Nbfr US 77 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Nbfr US 77 over Drainage Ditch carry?

About 2,150 vehicles per day (2017 count).

How long is Nbfr US 77 over Drainage Ditch?

The structure is 165 ft (50.3 m) long with a longest span of 55 ft (16.8 m) and a deck 38 ft wide.

Who owns Nbfr US 77 over Drainage Ditch?

It is owned by the State Highway Agency.