SH 31 WB over Rush Creek Relief No. 1
GoodNavarro County, Texas · 3.65 MI NE of FM 55S · Structure no. 181750016204102
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected December 2023
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 2,927
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SH 31 WB over Rush Creek Relief No. 1 is a concrete continuous slab carrying SH 31 WB over Rush Creek Relief No. 1 in Navarro County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,927 vehicles a day, roughly 22% of them trucks, projected to reach 9,750 by 2030. The structure is 80 ft (24.4 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 31 WB over Rush Creek Relief No. 1 built?
It was built in 2007, making it 18 years old in 2025.
What condition is SH 31 WB over Rush Creek Relief No. 1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SH 31 WB over Rush Creek Relief No. 1 carry?
About 2,927 vehicles per day (2019 count), of which roughly 22% are trucks.
How long is SH 31 WB over Rush Creek Relief No. 1?
The structure is 80 ft (24.4 m) long with a longest span of 30 ft (9.1 m) and a deck 40 ft wide.
Who owns SH 31 WB over Rush Creek Relief No. 1?
It is owned by the State Highway Agency.