SH 31 EB over Rush Creek Relief No. 1
FairNavarro County, Texas · 3.65 MI NE of FM 55S · Structure no. 181750016204087
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 137 ft
- 4 main spans
- Daily traffic
- 2,927
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SH 31 EB over Rush Creek Relief No. 1 is a concrete stringer/multi-beam or girder carrying SH 31 EB over Rush Creek Relief No. 1 in Navarro County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,927 vehicles a day, roughly 14% of them trucks, projected to reach 4,000 by 2033. The structure is 137 ft (41.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 31 EB over Rush Creek Relief No. 1 built?
It was built in 1989, making it 36 years old in 2025.
What condition is SH 31 EB over Rush Creek Relief No. 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does SH 31 EB over Rush Creek Relief No. 1 carry?
About 2,927 vehicles per day (2019 count), of which roughly 14% are trucks.
How long is SH 31 EB over Rush Creek Relief No. 1?
The structure is 137 ft (41.8 m) long with a longest span of 34 ft (10.4 m) and a deck 40 ft wide.
Who owns SH 31 EB over Rush Creek Relief No. 1?
It is owned by the State Highway Agency.