US Bridges

Morris RD (cr 472) over East Carancahua Draw

Good

Matagorda County, Texas · 2.0 MI S of FM 616 · Structure no. 131580AA0190002

Built
2018
7 years old
Condition
Good
inspected February 2024
Type
Other
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
47
2022 count
Owner
County
County Highway Agency

About this bridge

Morris RD (cr 472) over East Carancahua Draw is a prestressed concrete other carrying Morris RD (cr 472) over East Carancahua Draw in Matagorda County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 47 vehicles a day, roughly 3% of them trucks, projected to reach 78 by 2042. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesMorris RD (cr 472)
CrossesEast Carancahua Draw
Location2.0 MI S of FM 616
RouteCounty Highway 472
StateTexas
Coordinates28.84077, -96.28999
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadHL 93
Structure length80 ft (24.4 m)
Longest span50 ft (15.2 m)
Deck width26 ft (7.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic47 (2022)
Projected traffic78 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Morris RD (cr 472) over East Carancahua Draw built?

It was built in 2018, making it 7 years old in 2025.

What condition is Morris RD (cr 472) over East Carancahua Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Morris RD (cr 472) over East Carancahua Draw carry?

About 47 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Morris RD (cr 472) over East Carancahua Draw?

The structure is 80 ft (24.4 m) long with a longest span of 50 ft (15.2 m) and a deck 26 ft wide.

Who owns Morris RD (cr 472) over East Carancahua Draw?

It is owned by the County Highway Agency.