US Bridges

FM 79 over Pine Creek Draw

Good

Lamar County, Texas · 1.6 MI NW of US 82 · Structure no. 011390068802033

Built
1998
27 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete
Length
28 ft
3 main spans
Daily traffic
6,639
2020 count
Owner
State
State Highway Agency

About this bridge

FM 79 over Pine Creek Draw is a concrete culvert carrying FM 79 over Pine Creek Draw in Lamar County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,639 vehicles a day, roughly 17% of them trucks, projected to reach 8,149 by 2039. The structure is 28 ft (8.5 m) long and 58 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesFM 79
CrossesPine Creek Draw
Location1.6 MI NW of US 82
RouteState Highway 79
StateTexas
Coordinates33.69179, -95.60178
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span8 ft (2.4 m)
Deck width58 ft (17.7 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic6,639 (2020)
Projected traffic8,149 by 2039
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 79 over Pine Creek Draw built?

It was built in 1998, making it 27 years old in 2025.

What condition is FM 79 over Pine Creek Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does FM 79 over Pine Creek Draw carry?

About 6,639 vehicles per day (2020 count), of which roughly 17% are trucks.

How long is FM 79 over Pine Creek Draw?

The structure is 28 ft (8.5 m) long with a longest span of 8 ft (2.4 m) and a deck 58 ft wide.

Who owns FM 79 over Pine Creek Draw?

It is owned by the State Highway Agency.