FM 79 over Pine Creek Relief
FairLamar County, Texas · 1.90 MI NW of US 82 · Structure no. 011390068802029
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 61 ft
- 2 main spans
- Daily traffic
- 6,639
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 79 over Pine Creek Relief is a concrete stringer/multi-beam or girder carrying FM 79 over Pine Creek Relief in Lamar County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,639 vehicles a day, roughly 17% of them trucks, projected to reach 8,149 by 2039. The structure is 61 ft (18.6 m) long and 46 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 79 over Pine Creek Relief built?
It was built in 1971, making it 54 years old in 2025.
What condition is FM 79 over Pine Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does FM 79 over Pine Creek Relief carry?
About 6,639 vehicles per day (2020 count), of which roughly 17% are trucks.
How long is FM 79 over Pine Creek Relief?
The structure is 61 ft (18.6 m) long with a longest span of 30 ft (9.1 m) and a deck 46 ft wide.
Who owns FM 79 over Pine Creek Relief?
It is owned by the State Highway Agency.