US Bridges

US 67 NB over CR 801

Good

Johnson County, Texas · 1.1 Mi. E. of SH 174 · Structure no. 021270025906091

Built
2017
8 years old
Condition
Good
inspected October 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
142 ft
1 main span
Daily traffic
9,005
2023 count
Owner
State
State Highway Agency

About this bridge

US 67 NB over CR 801 is a prestressed concrete stringer/multi-beam or girder carrying US 67 NB over CR 801 in Johnson County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,005 vehicles a day, roughly 23% of them trucks, projected to reach 22,210 by 2034. The structure is 142 ft (43.3 m) long and 40 ft wide.

CarriesUS 67 NB
CrossesCR 801
Location1.1 Mi. E. of SH 174
RouteU.S. Route 67
StateTexas
Coordinates32.38138, -97.3737
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadHS 20
Structure length142 ft (43.3 m)
Longest span83 ft (25.3 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,005 (2023)
Projected traffic22,210 by 2034
Trucks23%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 67 NB over CR 801 built?

It was built in 2017, making it 8 years old in 2025.

What condition is US 67 NB over CR 801 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does US 67 NB over CR 801 carry?

About 9,005 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is US 67 NB over CR 801?

The structure is 142 ft (43.3 m) long with a longest span of 83 ft (25.3 m) and a deck 40 ft wide.

Who owns US 67 NB over CR 801?

It is owned by the State Highway Agency.