US Bridges

US 67 NB On-Rp over E Buffalo Ck Relief

Good

Johnson County, Texas · 1.4 Mi. E. of SH 174 · Structure no. 021270025906093

Built
2016
9 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
204 ft
2 main spans
Daily traffic
13,300
2016 count
Owner
State
State Highway Agency

About this bridge

US 67 NB On-Rp over E Buffalo Ck Relief is a prestressed concrete stringer/multi-beam or girder carrying US 67 NB On-Rp over E Buffalo Ck Relief in Johnson County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,300 vehicles a day, roughly 23% of them trucks, projected to reach 22,210 by 2034. The structure is 204 ft (62.2 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 67 NB On-Rp
CrossesE Buffalo Ck Relief
Location1.4 Mi. E. of SH 174
RouteU.S. Route 67
StateTexas
Coordinates32.3822, -97.36932
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length204 ft (62.2 m)
Longest span114 ft (34.7 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,300 (2016)
Projected traffic22,210 by 2034
Trucks23%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 67 NB On-Rp over E Buffalo Ck Relief built?

It was built in 2016, making it 9 years old in 2025.

What condition is US 67 NB On-Rp over E Buffalo Ck Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does US 67 NB On-Rp over E Buffalo Ck Relief carry?

About 13,300 vehicles per day (2016 count), of which roughly 23% are trucks.

How long is US 67 NB On-Rp over E Buffalo Ck Relief?

The structure is 204 ft (62.2 m) long with a longest span of 114 ft (34.7 m) and a deck 26 ft wide.

Who owns US 67 NB On-Rp over E Buffalo Ck Relief?

It is owned by the State Highway Agency.