FM 3376 over Chiltipin Creek Relief
GoodJim Wells County, Texas · 1.7 MI E of Bus 281 · Structure no. 161260333901005
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected April 2024
- Type
- Other
- Prestressed Concrete
- Length
- 160 ft
- 4 main spans
- Daily traffic
- 3,424
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
FM 3376 over Chiltipin Creek Relief is a prestressed concrete other carrying FM 3376 over Chiltipin Creek Relief in Jim Wells County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,424 vehicles a day, roughly 10% of them trucks, projected to reach 4,794 by 2042. The structure is 160 ft (48.8 m) long and 30 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 3376 over Chiltipin Creek Relief built?
It was built in 1987, making it 38 years old in 2025.
What condition is FM 3376 over Chiltipin Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does FM 3376 over Chiltipin Creek Relief carry?
About 3,424 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is FM 3376 over Chiltipin Creek Relief?
The structure is 160 ft (48.8 m) long with a longest span of 40 ft (12.2 m) and a deck 30 ft wide.
Who owns FM 3376 over Chiltipin Creek Relief?
It is owned by the State Highway Agency.