US Bridges

US 281 Nbml Ramp 1 over Paisano Branch

Good

Jim Wells County, Texas · .42 MI N of CR 419 · Structure no. 161260025515309

Built
2022
3 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
35 ft
4 main spans
Daily traffic
13,514
2021 count
Owner
State
State Highway Agency

About this bridge

US 281 Nbml Ramp 1 over Paisano Branch is a concrete culvert carrying US 281 Nbml Ramp 1 over Paisano Branch in Jim Wells County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,514 vehicles a day, roughly 36% of them trucks, projected to reach 18,920 by 2041. The structure is 35 ft (10.7 m) long and 120 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesUS 281 Nbml Ramp 1
CrossesPaisano Branch
Location.42 MI N of CR 419
RouteU.S. Route 281
StateTexas
Coordinates27.33387, -98.12651
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length35 ft (10.7 m)
Longest span6 ft (1.8 m)
Deck width120 ft (36.6 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,514 (2021)
Projected traffic18,920 by 2041
Trucks36%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 281 Nbml Ramp 1 over Paisano Branch built?

It was built in 2022, making it 3 years old in 2025.

What condition is US 281 Nbml Ramp 1 over Paisano Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does US 281 Nbml Ramp 1 over Paisano Branch carry?

About 13,514 vehicles per day (2021 count), of which roughly 36% are trucks.

How long is US 281 Nbml Ramp 1 over Paisano Branch?

The structure is 35 ft (10.7 m) long with a longest span of 6 ft (1.8 m) and a deck 120 ft wide.

Who owns US 281 Nbml Ramp 1 over Paisano Branch?

It is owned by the State Highway Agency.