US Bridges

US 281 SB over Paisano Creek

Good

Jim Wells County, Texas · 1.40 MI N of FM 1538 · Structure no. 161260025502079

Built
1985
40 years old, rebuilt 2022
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
34 ft
4 main spans
Daily traffic
5,050
2020 count
Owner
State
State Highway Agency

About this bridge

US 281 SB over Paisano Creek is a concrete culvert carrying US 281 SB over Paisano Creek in Jim Wells County, Texas. It was built in 1985 and reconstructed in 2022, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,050 vehicles a day, roughly 23% of them trucks, projected to reach 7,750 by 2033. The structure is 34 ft (10.5 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 281 SB
CrossesPaisano Creek
Location1.40 MI N of FM 1538
RouteU.S. Route 281
StateTexas
Coordinates27.32984, -98.12761
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length34 ft (10.5 m)
Longest span8 ft (2.4 m)
Deck width65 ft (19.8 m)
Roadway width45 ft (13.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,050 (2020)
Projected traffic7,750 by 2033
Trucks23%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 281 SB over Paisano Creek built?

It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2022.

What condition is US 281 SB over Paisano Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does US 281 SB over Paisano Creek carry?

About 5,050 vehicles per day (2020 count), of which roughly 23% are trucks.

How long is US 281 SB over Paisano Creek?

The structure is 34 ft (10.5 m) long with a longest span of 8 ft (2.4 m) and a deck 65 ft wide.

Who owns US 281 SB over Paisano Creek?

It is owned by the State Highway Agency.