Walden Road EB over Drainage Ditch
GoodPosted for loadJefferson County, Texas · 0.75 MI E of FM 364 · Structure no. 201240B01195003
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected June 2023
- Type
- Other
- Prestressed Concrete
- Length
- 110 ft
- 2 main spans
- Daily traffic
- 6,170
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Walden Road EB over Drainage Ditch is a prestressed concrete other carrying Walden Road EB over Drainage Ditch in Jefferson County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 6,170 vehicles a day, projected to reach 6,170 by 2035. The structure is 110 ft (33.5 m) long and 34 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Walden Road EB over Drainage Ditch built?
It was built in 1998, making it 27 years old in 2025.
What condition is Walden Road EB over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Walden Road EB over Drainage Ditch carry?
About 6,170 vehicles per day (2015 count).
How long is Walden Road EB over Drainage Ditch?
The structure is 110 ft (33.5 m) long with a longest span of 40 ft (12.2 m) and a deck 34 ft wide.
Who owns Walden Road EB over Drainage Ditch?
It is owned by the City or Municipal Highway Agency.