Pevitot RD over Drain Ditch
FairPosted for loadJefferson County, Texas · 0.7 MI E of SH 364 · Structure no. 201240B00903001
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 61 ft
- 2 main spans
- Daily traffic
- 143
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pevitot RD over Drain Ditch is a concrete stringer/multi-beam or girder carrying Pevitot RD over Drain Ditch in Jefferson County, Texas. It was built in 1973, so it is 52 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 143 vehicles a day, projected to reach 140 by 2035. The structure is 61 ft (18.6 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pevitot RD over Drain Ditch built?
It was built in 1973, making it 52 years old in 2025.
What condition is Pevitot RD over Drain Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Pevitot RD over Drain Ditch carry?
About 143 vehicles per day (2022 count).
How long is Pevitot RD over Drain Ditch?
The structure is 61 ft (18.6 m) long with a longest span of 31 ft (9.4 m) and a deck 28 ft wide.
Who owns Pevitot RD over Drain Ditch?
It is owned by the City or Municipal Highway Agency.