US 59 NB over Navidad Riv. East Relief
GoodJackson County, Texas · 2.67 MI SW of FM 710 · Structure no. 131210008904191
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 11,648
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
US 59 NB over Navidad Riv. East Relief is a concrete stringer/multi-beam or girder carrying US 59 NB over Navidad Riv. East Relief in Jackson County, Texas. It was built in 1976, so it is 49 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,648 vehicles a day, roughly 17% of them trucks, projected to reach 16,610 by 2033. The structure is 120 ft (36.6 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 59 NB over Navidad Riv. East Relief built?
It was built in 1976, making it 49 years old in 2025.
What condition is US 59 NB over Navidad Riv. East Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does US 59 NB over Navidad Riv. East Relief carry?
About 11,648 vehicles per day (2020 count), of which roughly 17% are trucks.
How long is US 59 NB over Navidad Riv. East Relief?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 44 ft wide.
Who owns US 59 NB over Navidad Riv. East Relief?
It is owned by the State Highway Agency.