US 59 SB over Navidad Riv. East Relief
FairJackson County, Texas · 2.67 MI SW of FM 710 · Structure no. 131210008904061
- Built
- 1956
- 69 years old, rebuilt 1993
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 121 ft
- 4 main spans
- Daily traffic
- 11,663
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
US 59 SB over Navidad Riv. East Relief is a concrete stringer/multi-beam or girder carrying US 59 SB over Navidad Riv. East Relief in Jackson County, Texas. It was built in 1956 and reconstructed in 1993, so it is 69 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,663 vehicles a day, roughly 17% of them trucks, projected to reach 16,610 by 2033. The structure is 121 ft (36.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 59 SB over Navidad Riv. East Relief built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1993.
What condition is US 59 SB over Navidad Riv. East Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does US 59 SB over Navidad Riv. East Relief carry?
About 11,663 vehicles per day (2019 count), of which roughly 17% are trucks.
How long is US 59 SB over Navidad Riv. East Relief?
The structure is 121 ft (36.9 m) long with a longest span of 30 ft (9.1 m) and a deck 40 ft wide.
Who owns US 59 SB over Navidad Riv. East Relief?
It is owned by the State Highway Agency.