US Bridges

Barton Chap Pct 3 over Salt Creek

FairPosted for load

Jack County, Texas · 2.0 MI W of FM 4 · Structure no. 021200AA0240001

Built
1957
68 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
62 ft
1 main span
Daily traffic
45
2019 count
Owner
County
County Highway Agency

About this bridge

Barton Chap Pct 3 over Salt Creek is a steel stringer/multi-beam or girder carrying Barton Chap Pct 3 over Salt Creek in Jack County, Texas. It was built in 1957, so it is 68 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 45 vehicles a day, projected to reach 120 by 2031. The structure is 62 ft (18.9 m) long and 14 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesBarton Chap Pct 3
CrossesSalt Creek
Location2.0 MI W of FM 4
RouteCounty Highway 0
StateTexas
Coordinates33.06448, -98.27132
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22 US tons
Inventory rating13 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadUnknown
Structure length62 ft (18.9 m)
Longest span49 ft (14.9 m)
Deck width14 ft (4.3 m)
Roadway width13 ft (4.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45 (2019)
Projected traffic120 by 2031
Trucks0%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$17,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Barton Chap Pct 3 over Salt Creek built?

It was built in 1957, making it 68 years old in 2025.

What condition is Barton Chap Pct 3 over Salt Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Barton Chap Pct 3 over Salt Creek carry?

About 45 vehicles per day (2019 count).

How long is Barton Chap Pct 3 over Salt Creek?

The structure is 62 ft (18.9 m) long with a longest span of 49 ft (14.9 m) and a deck 14 ft wide.

Who owns Barton Chap Pct 3 over Salt Creek?

It is owned by the County Highway Agency.