Barton Chap Pct 3 over Salt Creek
FairPosted for loadJack County, Texas · 2.0 MI W of FM 4 · Structure no. 021200AA0240001
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 62 ft
- 1 main span
- Daily traffic
- 45
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Barton Chap Pct 3 over Salt Creek is a steel stringer/multi-beam or girder carrying Barton Chap Pct 3 over Salt Creek in Jack County, Texas. It was built in 1957, so it is 68 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 45 vehicles a day, projected to reach 120 by 2031. The structure is 62 ft (18.9 m) long and 14 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Barton Chap Pct 3 over Salt Creek built?
It was built in 1957, making it 68 years old in 2025.
What condition is Barton Chap Pct 3 over Salt Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Barton Chap Pct 3 over Salt Creek carry?
About 45 vehicles per day (2019 count).
How long is Barton Chap Pct 3 over Salt Creek?
The structure is 62 ft (18.9 m) long with a longest span of 49 ft (14.9 m) and a deck 14 ft wide.
Who owns Barton Chap Pct 3 over Salt Creek?
It is owned by the County Highway Agency.