Salt Creek R Pct 3 over East Salt Creek
GoodJack County, Texas · 4.5 MI S. of US 380 · Structure no. 021200AA0243009
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected February 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 65 ft
- 1 main span
- Daily traffic
- 100
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Salt Creek R Pct 3 over East Salt Creek is a prestressed concrete box beam or girders - multiple carrying Salt Creek R Pct 3 over East Salt Creek in Jack County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 100 by 2031. The structure is 65 ft (19.8 m) long and 26 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salt Creek R Pct 3 over East Salt Creek built?
It was built in 2012, making it 13 years old in 2025.
What condition is Salt Creek R Pct 3 over East Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Salt Creek R Pct 3 over East Salt Creek carry?
About 100 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Salt Creek R Pct 3 over East Salt Creek?
The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 26 ft wide.
Who owns Salt Creek R Pct 3 over East Salt Creek?
It is owned by the County Highway Agency.