SH 276 EB over S Fork Sabine River Rel
GoodHunt County, Texas · 9.7 MI W JCT SH34/SH276 · Structure no. 011170129005018
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 7,560
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
SH 276 EB over S Fork Sabine River Rel is a prestressed concrete stringer/multi-beam or girder carrying SH 276 EB over S Fork Sabine River Rel in Hunt County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,560 vehicles a day, roughly 5% of them trucks, projected to reach 13,080 by 2030. The structure is 240 ft (73.2 m) long and 41 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 276 EB over S Fork Sabine River Rel built?
It was built in 2006, making it 19 years old in 2025.
What condition is SH 276 EB over S Fork Sabine River Rel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does SH 276 EB over S Fork Sabine River Rel carry?
About 7,560 vehicles per day (2010 count), of which roughly 5% are trucks.
How long is SH 276 EB over S Fork Sabine River Rel?
The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 41 ft wide.
Who owns SH 276 EB over S Fork Sabine River Rel?
It is owned by the State Highway Agency.