SH 276 EB over S Fork Sabine River
GoodHunt County, Texas · 0.4 Miles West of FM 1565 · Structure no. 011170129005017
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 340 ft
- 5 main spans
- Daily traffic
- 3,440
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SH 276 EB over S Fork Sabine River is a prestressed concrete stringer/multi-beam or girder carrying SH 276 EB over S Fork Sabine River in Hunt County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,440 vehicles a day, roughly 4% of them trucks, projected to reach 4,820 by 2033. The structure is 340 ft (103.6 m) long and 41 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 276 EB over S Fork Sabine River built?
It was built in 2006, making it 19 years old in 2025.
What condition is SH 276 EB over S Fork Sabine River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does SH 276 EB over S Fork Sabine River carry?
About 3,440 vehicles per day (2013 count), of which roughly 4% are trucks.
How long is SH 276 EB over S Fork Sabine River?
The structure is 340 ft (103.6 m) long with a longest span of 80 ft (24.4 m) and a deck 41 ft wide.
Who owns SH 276 EB over S Fork Sabine River?
It is owned by the State Highway Agency.