US Bridges

IH 30 WB over Rock Creek Relief #2

Good

Hopkins County, Texas · 5.60 MI E of SH 19 · Structure no. 011130001002259

Built
2013
12 years old
Condition
Good
inspected January 2025
Type
Other
Prestressed Concrete
Length
202 ft
4 main spans
Daily traffic
19,874
2019 count
Owner
State
State Highway Agency

About this bridge

IH 30 WB over Rock Creek Relief #2 is a prestressed concrete other carrying IH 30 WB over Rock Creek Relief #2 in Hopkins County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,874 vehicles a day, roughly 31% of them trucks, projected to reach 17,930 by 2033. The structure is 202 ft (61.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 30 WB
CrossesRock Creek Relief #2
Location5.60 MI E of SH 19
RouteInterstate 30
StateTexas
Coordinates33.14602, -95.55239
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length202 ft (61.6 m)
Longest span52 ft (16 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,874 (2019)
Projected traffic17,930 by 2033
Trucks31%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 30 WB over Rock Creek Relief #2 built?

It was built in 2013, making it 12 years old in 2025.

What condition is IH 30 WB over Rock Creek Relief #2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does IH 30 WB over Rock Creek Relief #2 carry?

About 19,874 vehicles per day (2019 count), of which roughly 31% are trucks.

How long is IH 30 WB over Rock Creek Relief #2?

The structure is 202 ft (61.6 m) long with a longest span of 52 ft (16 m) and a deck 46 ft wide.

Who owns IH 30 WB over Rock Creek Relief #2?

It is owned by the State Highway Agency.