Mile 7 W RD over N Main Drainage Ditch
FairPosted for loadHidalgo County, Texas · 0.20 MI N of Mile 19 N RD · Structure no. 211090AA0355001
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 93 ft
- 3 main spans
- Daily traffic
- 73
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Mile 7 W RD over N Main Drainage Ditch is a concrete stringer/multi-beam or girder carrying Mile 7 W RD over N Main Drainage Ditch in Hidalgo County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 73 vehicles a day, roughly 2% of them trucks, projected to reach 110 by 2030. The structure is 93 ft (28.3 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mile 7 W RD over N Main Drainage Ditch built?
It was built in 1986, making it 39 years old in 2025.
What condition is Mile 7 W RD over N Main Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Mile 7 W RD over N Main Drainage Ditch carry?
About 73 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is Mile 7 W RD over N Main Drainage Ditch?
The structure is 93 ft (28.3 m) long with a longest span of 30 ft (9.2 m) and a deck 28 ft wide.
Who owns Mile 7 W RD over N Main Drainage Ditch?
It is owned by the County Highway Agency.