E Richey RD over Hcfcd Ditch K111-03-00
FairHarris County, Texas · 0.50 MI SE of FM 1960 · Structure no. 121020B54217001
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 150 ft
- 3 main spans
- Daily traffic
- 2,860
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
E Richey RD over Hcfcd Ditch K111-03-00 is a prestressed concrete box beam or girders - multiple carrying E Richey RD over Hcfcd Ditch K111-03-00 in Harris County, Texas. It was built in 1987, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,860 vehicles a day, projected to reach 2,860 by 2035. The structure is 150 ft (45.7 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Richey RD over Hcfcd Ditch K111-03-00 built?
It was built in 1987, making it 38 years old in 2025.
What condition is E Richey RD over Hcfcd Ditch K111-03-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does E Richey RD over Hcfcd Ditch K111-03-00 carry?
About 2,860 vehicles per day (2015 count).
How long is E Richey RD over Hcfcd Ditch K111-03-00?
The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 34 ft wide.
Who owns E Richey RD over Hcfcd Ditch K111-03-00?
It is owned by the County Highway Agency.