Farrell RD over Hcfcd Ditch K111-03-00
FairPosted for loadHarris County, Texas · 2.90 MI E of Hardy RD · Structure no. 121020B23689142
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 98 ft
- 3 main spans
- Daily traffic
- 3,040
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Farrell RD over Hcfcd Ditch K111-03-00 is a concrete stringer/multi-beam or girder carrying Farrell RD over Hcfcd Ditch K111-03-00 in Harris County, Texas. It was built in 1960, so it is 65 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,040 vehicles a day, roughly 1% of them trucks, projected to reach 725 by 2035. The structure is 98 ft (29.9 m) long and 28 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Farrell RD over Hcfcd Ditch K111-03-00 built?
It was built in 1960, making it 65 years old in 2025.
What condition is Farrell RD over Hcfcd Ditch K111-03-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Farrell RD over Hcfcd Ditch K111-03-00 carry?
About 3,040 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Farrell RD over Hcfcd Ditch K111-03-00?
The structure is 98 ft (29.9 m) long with a longest span of 32 ft (9.8 m) and a deck 28 ft wide.
Who owns Farrell RD over Hcfcd Ditch K111-03-00?
It is owned by the City or Municipal Highway Agency.