S Post Oak RD NB over Hcfcd Unit C147-00-00
FairHarris County, Texas · 0.05 MI S of W Fuqua · Structure no. 121020B52313008
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 25,440
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Post Oak RD NB over Hcfcd Unit C147-00-00 is a prestressed concrete box beam or girders - multiple carrying S Post Oak RD NB over Hcfcd Unit C147-00-00 in Harris County, Texas. It was built in 1984, so it is 41 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,440 vehicles a day, roughly 5% of them trucks, projected to reach 40,000 by 2031. The structure is 62 ft (18.9 m) long and 34 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Post Oak RD NB over Hcfcd Unit C147-00-00 built?
It was built in 1984, making it 41 years old in 2025.
What condition is S Post Oak RD NB over Hcfcd Unit C147-00-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does S Post Oak RD NB over Hcfcd Unit C147-00-00 carry?
About 25,440 vehicles per day (2011 count), of which roughly 5% are trucks.
How long is S Post Oak RD NB over Hcfcd Unit C147-00-00?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 34 ft wide.
Who owns S Post Oak RD NB over Hcfcd Unit C147-00-00?
It is owned by the City or Municipal Highway Agency.