Tiffany DR over Hcfcd Unit C147-00-00
FairPosted for loadHarris County, Texas · 0.35 MI E of S Post Oak · Structure no. 121020B64329531
- Built
- 1950
- 75 years old, rebuilt 1999
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 33 ft
- 1 main span
- Daily traffic
- 70
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Tiffany DR over Hcfcd Unit C147-00-00 is a wood or timber stringer/multi-beam or girder carrying Tiffany DR over Hcfcd Unit C147-00-00 in Harris County, Texas. It was built in 1950 and reconstructed in 1999, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 70 vehicles a day, roughly 5% of them trucks, projected to reach 440 by 2031. The structure is 33 ft (10.1 m) long and 22 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tiffany DR over Hcfcd Unit C147-00-00 built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1999.
What condition is Tiffany DR over Hcfcd Unit C147-00-00 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Tiffany DR over Hcfcd Unit C147-00-00 carry?
About 70 vehicles per day (2011 count), of which roughly 5% are trucks.
How long is Tiffany DR over Hcfcd Unit C147-00-00?
The structure is 33 ft (10.1 m) long with a longest span of 15 ft (4.6 m) and a deck 22 ft wide.
Who owns Tiffany DR over Hcfcd Unit C147-00-00?
It is owned by the City or Municipal Highway Agency.