US Bridges

Hall RD over Hcfcd Unit A120-00-00

Fair

Harris County, Texas · 0.01 MI SW of Beamer · Structure no. 121020B29729536

Built
1975
50 years old, rebuilt 1986
Condition
Fair
inspected September 2023
Type
Culvert
Concrete
Length
51 ft
4 main spans
Daily traffic
6,460
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hall RD over Hcfcd Unit A120-00-00 is a concrete culvert carrying Hall RD over Hcfcd Unit A120-00-00 in Harris County, Texas. It was built in 1975 and reconstructed in 1986, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,460 vehicles a day, roughly 5% of them trucks, projected to reach 7,100 by 2031. The structure is 51 ft (15.5 m) long and 97 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHall RD
CrossesHcfcd Unit A120-00-00
Location0.01 MI SW of Beamer
RouteCity Street 0
StateTexas
Coordinates29.59658, -95.22782
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length51 ft (15.5 m)
Longest span12 ft (3.7 m)
Deck width97 ft (29.6 m)
Roadway width39 ft (11.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,460 (2011)
Projected traffic7,100 by 2031
Trucks5%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$50,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Hall RD over Hcfcd Unit A120-00-00 built?

It was built in 1975, making it 50 years old in 2025. It was reconstructed in 1986.

What condition is Hall RD over Hcfcd Unit A120-00-00 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Hall RD over Hcfcd Unit A120-00-00 carry?

About 6,460 vehicles per day (2011 count), of which roughly 5% are trucks.

How long is Hall RD over Hcfcd Unit A120-00-00?

The structure is 51 ft (15.5 m) long with a longest span of 12 ft (3.7 m) and a deck 97 ft wide.

Who owns Hall RD over Hcfcd Unit A120-00-00?

It is owned by the City or Municipal Highway Agency.